Rail Vikas Nigam (RVNL) is the Lowest Bidder (L1) for Package No. C-4: Composite Contract package associated with the new BG Railway Line of the HORC project for:
i)Design and construction of a twin tunnel from km 24.880 to km 29.580 using NATM and the cut-and-cover method:
ii) Design and installation of ballast-free track from km 24.856 to km 29.680 (excluding rail supply).
iii) Detailed Design, Supply, Installation, Testing, and Commissioning of General Electrical Services, including the supply, erection, testing, and commissioning of an 11 kV HT/LT power and control cable network.
GIS Substation (11/0.433) kVA. Tunnel lighting system, etc. from km 24.880 to km 29.680. iv) Design & Construction of Embankment. Bridges and other miscellaneous works from km 12.00 to km 18.00 The cost of project is Rs. 1088.49 crore.