Suzlon Energy, a renewable energy solutions provider on Tuesday said that it has secured an order to develop 48.3 MW wind power project for Adani Green Energy Ltd.
Suzlon will install 23 units of their wind turbine generators (WTGs) with a hybrid lattice tubular (HLT) tower and a rated capacity of 2.1 MW each. The project is located in Mandvi, Kutch Gujarat and is expected to be commissioned in 2023. This order is a repeat order from Adani Green Energy and is in addition to the existing order of 226.8 MW.
Suzlon will execute the project with a scope of supply, installation, and commissioning. Additionally, Suzlon will offer post-commissioning operation and maintenance services.